+31(0)598 394 035

Produced with precision

Produced with precision

Minimal margins

The production of a wind turbine tower is a precision job. The margin for errors are extremely small, and the high standards of the major players on the wind turbine market must be met.

MST is easier to transport

Transport

In contrast to the traditional method of building wind turbines, the MST’s from Steel Tower Europe are supplied as ready-made kits, which are relatively easy to transport in normal trucks.

MST more efficient logistics

Logistics

The steel tower Europe Group’s modular wind turbine towers can be transported in smaller sizes, and with significantly fewer trucks. The classic ‘tower crane’ is also no longer necessary. The ‘climbing crane’ is now used for this, which climbs up with the tower during assembly.

The production process in pictures